Project Overview

This project consists of the implementation of tolled express lanes along the SR 826/Palmetto Expressway from Flagler Street to NW 154 Street and along I-75 from SR 826/Palmetto Expressway to NW 170 Street in Miami-Dade County. The project is approximately 13 miles in length and will provide continuity to the I-75 Express Lanes project currently under development by FDOT District Four, from NW 170 Street in Miami-Dade County to I-595 in Broward County.

The purpose of the project as envisioned in the emerging South Florida Express Lanes network is to improve mobility, relieve congestion, provide additional travel options, accommodate future growth and development in the region, and improve system connectivity between key limited access facilities in South Florida: SR 826, I-75, SR 924, Florida's Turnpike, I-595, and the Sawgrass Expressway.

Tolled express lanes will be incorporated along the study corridor with moderate widening of the SR 826/Palmetto Expressway mainline. The proposed express lanes along the Palmetto Expressway will be physically separated with plastic poles from the local traffic lanes. The express lanes along I-75 will be constructed in the median. It is anticipated that the project will be contained within the existing public right-of-way. Overall improvements under consideration include:

  • One to two tolled express lane in each direction along the Palmetto Expressway, from Flagler Street to NW 154 Street and one tolled express lane in each direction along I-75 from the Palmetto Expressway to NW 170 Street
  • Construction of a new flyover connecting the SR 826/Palmetto and I-75 express lanes.
  • Access points to/from the express lanes system
  • Ramp Metering at all entrance ramps along the Palmetto Expressway
  • Installation of noise barrier walls at specific locations along I-75
  • New lighting along the I-75 express lanes

STATUS
The Project Development and Environment phase has been completed. The Location and Design Concept Acceptance (LDCA) was granted in January 2013.  The project was let for the Design/Build Phase on November 21, 2013.  Construction started on April 1, 2014 and is anticipated to end in fall 2017.

FINANCING
The preliminary construction cost estimate is approximately $244 million. The Department will deliver this project as Design-Build.

PROCUREMENT
The Financial Management Number for the I-75/Palmetto Express lanes project in Miami-Dade County is 432687-1-52-01.



Contact

Florida Department of Transportation

Toll Free- 1-866-513-7623

Express Lanes / FDOT logo
lines

Marta Rodriguez, Public Information Specialist

Phone: (305) 592-6026|E-mail: Marta.Rodriguez@dot.state.fl.us

Kathy McLendon, Construction Public Information Project Manager

Phone: (305) 640-7437|E-mail: Kathy.McLendon@dot.state.fl.us

Tish Burgher, District Public Information Officer

Phone: (305) 470-5349|E-mail: Tish.Burgher@dot.state.fl.us